Alat Desain Tata Letak Site BESS Berbasis AI

Desain Tata Letak
BESS

Dari batas site ke tata letak BESS yang optimal — tanpa latar belakang engineering. Untuk proyek skala C&I dan utility.

The Problem

Tata letak site menjadi hambatan di setiap tahap proyek BESS

A developer finds a site. Before anything moves — permits, financing, procurement — they need to answer one question: what fits on this land?

During development

Days to get a first draft

A solution manager sketches a concept, briefs an engineer, the engineer builds it in AutoCAD — days or weeks later, you have a first draft

During tender

Multiple layouts, tight deadlines

During tender, EPCs need multiple layout variations under tight deadlines — each one another round trip to engineering

After procurement

Equipment changes, layout restarts

After procurement, equipment specs change — and the layout needs to be redone from scratch

The Tool

Desain tata letak site BESS tanpa beban kerja engineering

Pembuatan tata letak instan

Draw your site boundary on a satellite map. The solver packs a complete layout — DC blocks, PCS skids, E-house, roads, and clearances — automatically.

Tangkapan layar produk — tata letak BESS yang dioptimalkan di peta satelit

Untuk Siapa

Dibangun untuk profesional penyimpanan energi

Developer

Cek kelayakan cepat. Bisakah target MWh Anda muat di site ini? Visualisasikan tata letak sebelum masuk ke engineering detail.

Kontraktor EPC

Tata letak awal untuk pengajuan tender. Buat tata letak site dengan cepat dan sertakan dalam proposal Anda.

Engineer

Titik awal untuk desain detail. Ekspor tata letak dan sempurnakan di alat CAD Anda. Hemat berjam-jam kerja tata letak awal.

Konsultan Industri

Dukung klien dengan konsep site visual. Buat opsi tata letak yang jelas untuk dipresentasikan saat advisory dan due diligence.

Investor

Evaluate sites independently. Understand how layout decisions affect energy density and land use — and come to the table with sharper questions for developers and EPCs.

FAQ

Frequently asked questions

What is a BESS site layout?+
A BESS site layout is the spatial arrangement of battery energy storage equipment on a given parcel — DC blocks, PCS & MV skids, E-house, access roads, fencing, and clearances. It determines how much energy capacity fits on the site and whether the design meets fire safety and access requirements.
How does the layout tool work?+
Draw your site boundary on a satellite map. The solver automatically places all equipment — DC blocks, PCS skids, E-house, roads, fencing, and gate — optimized for energy density under the spacing rules you configure. Tune the configuration, regenerate variants, and export the result. The full process takes seconds.
Do I need engineering experience to use it?+
No. The tool handles equipment placement, clearance rules, and road layout automatically. You draw a boundary and configure high-level inputs — DC block type, stacking, road topology. The solver does the engineering layout work.
What equipment does the tool support?+
Generic DC blocks (5–6.25 MWh, 20 ft containers), PCS & MV skids (20 ft and 40 ft), E-house (auto-sized to site power), perimeter and drive-through roads, security fencing, and vehicle gates. Pro users also get named manufacturer equipment from Jinko ESS, NR Electric, and others as we add them.
Is the tool free?+
Yes. The free plan includes 3 site layouts per month with generic equipment and a watermarked PNG export. Pro unlocks unlimited layouts, clean PNG and PDF exports, manufacturer equipment, saved layouts, and prioritized support.
Can I use it on my phone?+
Yes. The full layout tool is mobile-first — draw boundaries, solve, configure, and export directly from your phone. No app download required.

Know someone who could use this?

LinkedIn

Lihat Apa yang Muat di Site Anda

Gratis dengan pendaftaran cepat. Gambar batas Anda dan dapatkan tata letak dalam hitungan detik.

Mulai Tata Letak